Works realised in 2015:
- Assembly of the boiler house's main structure
- Assembly of the machine room’s housing
- Assembly of a stator and rotor of the generator
- Assembly of cooling water pumps
- Assembly of start-up boilers
- Assembly of unit, tap and reserve transformers
- Assembly of electrostatic precipitator's supporting structure
- Performance of reinforced concrete structures of ash tanks
- Performance of reinforced concrete structure of gypsum store
Works planned in 2016:
- Connecting the voltage of 110 kV and 400 kV
- Assembly of the pressure system - water test of the boiler
- Rinsing - etching of the boiler
- Start-up of the starting boiler house
- Boiler start-up
- Assembly of stacker-reclaimers
- Assembly of coal pulvilizers
- Start-up of the whole power plant
A new 1,075 MWe unit in Kozienice Power Plant
- The largest in Europe power unit fired with bituminous coal
- Completely independent unit, possessing its own infrastructure
- New unit means a 1/3 increase in the Kozienice Power Plant's capacity
- Unit No. 11 will allow to eliminate deficits of energy on the market
- High efficiency of energy generation
- High availability and low failure rate of the new unit
- The unit satisfies the conditions of the environmental protection
Due to the modern technology used by the construction of the new unit in Kozienice Power Plant there is a reduced CO2 emission.